Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Innkreis Autobahn cut-and-cover tunnel the solutions to the formwork challenges encountered during the extension of the motorway
Innkreis Autobahn cut-and-cover tunnel the solutions to the formwork challenges encountered during the extension of the motorway
Innkreis Autobahn cut-and-cover tunnel the solutions to the formwork challenges encountered during the extension of the motorway
Schweiger, A. (Autor:in)
CONCRETE ENGINEERING INTERNATIONAL ; 5 ; 31-33
01.01.2001
3 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Unterflurtrasse Steinhaus der A8 Innkreis Autobahn
Online Contents | 2003
The Madrid motorway - formwork overcomes obstacles
British Library Online Contents | 2004
|Formwork and falsework solutions make light work of motorway timescales
British Library Online Contents | 2005
|