Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The new kiln line 8 at Dyckerhoff Zement's Lengerich works - structural design of the preheater tower, raw meal silo and bucket elevator tower
ZKG INTERNATIONAL ; 54 ; 664-679
01.01.2001
16 pages
Aufsatz (Zeitschrift)
Deutsch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Dyckerhoff Zement's new raw meal silo at Lengerich
British Library Online Contents | 2002
|Dyckerhoff: Neue Drehofenlinie in Lengerich
Online Contents | 2002
Dyckerhoff: Neue Drehofenlinie in Lengerich
Online Contents | 2002
Dyckerhoff: Neue Drehofenlinie in Lengerich
Online Contents | 2002
Condition-oriented maintenance at Dyckerhoff AG's Lengerich cement works
British Library Online Contents | 2003
|