Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Developing Owner's Project Requirements During Pre-Design
Developing Owner's Project Requirements During Pre-Design
Developing Owner's Project Requirements During Pre-Design
Dorgan, C. (Autor:in) / Dorgan, C. E. (Autor:in) / Grindle, C. S. (Autor:in)
01.01.2002
7 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
621
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Developing Owner's Project Requirements During Pre-Design
British Library Conference Proceedings | 2002
|ASTM E2813 AND THE OWNER'S PROJECT REQUIREMENTS
British Library Online Contents | 2012
|Technical vs. Process Commissioning: Owner's Project Requirements
British Library Online Contents | 2013
|SCADA System Design: Meeting the Owner's Requirements
British Library Conference Proceedings | 1996
|The Owner's Responsibilities in Construction Project Management
British Library Conference Proceedings | 2005
|