Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Where Do We Stand with Fuzzy Project Scheduling?
Where Do We Stand with Fuzzy Project Scheduling?
Where Do We Stand with Fuzzy Project Scheduling?
Bonnal, P. (Autor:in) / Gourc, D. (Autor:in) / Lacoste, G. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 130 ; 114-123
01.01.2004
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Where Do We Stand with Fuzzy Project Scheduling?
Online Contents | 2004
|Criticality measurement in fuzzy project scheduling
Taylor & Francis Verlag | 2022
|Online Contents | 2000
|Reliability engineering - Where do we stand?
British Library Online Contents | 2000
|