Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flexible Model for Time/Cost Tradeoff Problem
Flexible Model for Time/Cost Tradeoff Problem
Flexible Model for Time/Cost Tradeoff Problem
Moussourakis, J. (Autor:in) / Haksever, C. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 130 ; 307-314
01.01.2004
8 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Flexible Model for Time-Cost Tradeoff Problem
Online Contents | 2004
|British Library Online Contents | 2005
|Decision support model for incentives/disincentives time–cost tradeoff
Online Contents | 2012
|