Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case Study: Izmit Domestic and Industrial Water Supply Build-Operate-Transfer Project
Case Study: Izmit Domestic and Industrial Water Supply Build-Operate-Transfer Project
Case Study: Izmit Domestic and Industrial Water Supply Build-Operate-Transfer Project
Senturk, H. A. (Autor:in) / Yazici, G. (Autor:in) / Kaplanoglu, B. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 130 ; 449-454
01.01.2004
6 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Study: Izmit Domestic and Industrial Water Supply Build-Operate-Transfer Project
Online Contents | 2004
|Pre-Project Planning for Build-Operate-Transfer (BOT) Project Risk Management
British Library Conference Proceedings | 1995
|Selecting a viable Build-Operate-Transfer (BOT) project to propose
Springer Verlag | 2002
|Izmit Bay Suspension Bridge - Overview of the Project
British Library Conference Proceedings | 2015
|