Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges
Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges
Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges
O Connor, J. T. (Autor:in) / Huh, Y. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 131 ; 1013-1020
01.01.2005
8 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges
Online Contents | 2005
|Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges
British Library Online Contents | 2006
|Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges
Online Contents | 2006
|