Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A linear-discrete scheduling model for the resource-constrained project scheduling problem
A linear-discrete scheduling model for the resource-constrained project scheduling problem
A linear-discrete scheduling model for the resource-constrained project scheduling problem
Bonnal, P. (Autor:in) / Gourc, D. (Autor:in) / Hameri, A.-P. (Autor:in) / Lacoste, G. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 23 ; 797-814
01.01.2005
18 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A linear-discrete scheduling model for the resource-constrained project scheduling problem
Online Contents | 2005
|Extensions of the resource-constrained project scheduling problem
Elsevier | 2023
|Hybrid multimode resource-constrained maintenance project scheduling problem
BASE | 2019
|