Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects
Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects
Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects
Zhang, H. (Autor:in) / Li, H. (Autor:in) / Tam, C. M. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 24 ; 159-169
01.01.2006
11 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Heuristic scheduling of resource#8208constrained, multiple#8208mode and repetitive projects
Online Contents | 2006
|Resource-Constrained Scheduling in Repetitive Projects
TIBKAT | 2019
|Heuristic scheduling of resource#8208constrained, multiple#8208mode and repetitive projects
Online Contents | 2006
|BASE | 2017
|Resource-constrained scheduling for continuous repetitive projects with time-based production units
Online Contents | 2009
|