Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
Elazouni, A. M. (Autor:in) / Metwally, F. G. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 133 ; 86-90
01.01.2007
5 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules
Online Contents | 2007
|Online Contents | 1997
Optimized Schedules for Airline Routes
Online Contents | 2004
|