Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Rehabilitation & Modernization of Fitting Out Pier 2 at Portsmouth Naval Shipyard
The Rehabilitation & Modernization of Fitting Out Pier 2 at Portsmouth Naval Shipyard
The Rehabilitation & Modernization of Fitting Out Pier 2 at Portsmouth Naval Shipyard
Coviello, C. W. (Autor:in)
CIVIL ENGINEERING PRACTICE -BOSTON- ; 21 ; 5-20
01.01.2006
16 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Surface subsidence at Naval Shipyard
Engineering Index Backfile | 1957
|Medical Facility Requirements-Naval Hospital Portsmouth
NTIS | 1993
|Online Contents | 1995
Carrier repair site -- Puget sound naval shipyard
Engineering Index Backfile | 1961
|Cellular Pier Rehabilitation Design
ASCE | 2022
|