Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Resource-constrained construction project scheduling model for profit maximization considering cash flow
Resource-constrained construction project scheduling model for profit maximization considering cash flow
Resource-constrained construction project scheduling model for profit maximization considering cash flow
Liu, S. S. (Autor:in) / Wang, C. J. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 17 ; 966-974
01.01.2008
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
Online Contents | 2010
|Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
British Library Online Contents | 2010
|