Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Using the IKEA model and virtual prototyping technology to improve construction process management
Using the IKEA model and virtual prototyping technology to improve construction process management
Using the IKEA model and virtual prototyping technology to improve construction process management
Li, H. (Autor:in) / Guo, H. (Autor:in) / Skibniewski, M. (Autor:in) / Skitmore, M. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 26 ; 991-1000
01.01.2008
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Using the IKEA model and virtual prototyping technology to improve construction process management
Online Contents | 2008
|IKEA Disobedients - Los que desobedecen a IKEA
Online Contents | 2011
Design-Ideen von Ikea - Ikea a Milano
Online Contents | 1995
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
British Library Online Contents | 2011
|Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
Online Contents | 2011
|