Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
Park, S.K. (Autor:in) / Julien, P.Y. (Autor:in) / Ji, U. (Autor:in) / Ruff, J.F. (Autor:in)
JOURNAL OF HYDRAULIC ENGINEERING -NEW YORK- ; 134 ; 1639-1650
01.01.2008
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
Online Contents | 2008
|Riverbank Filtration for the Water Supply on the Nakdong River, South Korea
DOAJ | 2019
|Case Study: Reconstruction of Runoff Series of Hydrological Stations in the Nakdong River, Korea
DOAJ | 2020
|