Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cut to the quick: How Six Sigma saved Tubelines millions in slope stabilisation
Cut to the quick: How Six Sigma saved Tubelines millions in slope stabilisation
Cut to the quick: How Six Sigma saved Tubelines millions in slope stabilisation
GROUND ENGINEERING ; 42 ; 18-19
01.01.2009
2 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
625
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cut to the quick - How Six Sigma saved Tubelines millions in slope stabilisation
Online Contents | 2009
Engineering Index Backfile | 1910
Technology Committee Activities Have Saved Ohio PWSs Hundreds of Millions
British Library Conference Proceedings | 2012
|Cash saved on slope protection
Engineering Index Backfile | 1967
|British Library Conference Proceedings | 2009
|