Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River
Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River
Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River
Lu, Y.-j. (Autor:in) / Zuo, L.-q. (Autor:in) / Ji, R.-y. (Autor:in) / Mao, J.-x. (Autor:in)
ADVANCES IN WATER SCIENCE ; 20 ; 324-330
01.01.2009
7 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
553.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
HENRY – Bundesanstalt für Wasserbau (BAW) | 2016
|British Library Conference Proceedings | 2004
|British Library Conference Proceedings | 2004
|Three gorges dam reservoir, Yangtze river, China
Tema Archiv | 1995
|Springer Verlag | 2023
|