Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case History: Long-Term Performance of a Fluoropolymer-Lined Process Vessel
Case History: Long-Term Performance of a Fluoropolymer-Lined Process Vessel
Case History: Long-Term Performance of a Fluoropolymer-Lined Process Vessel
Argasinski, J.K. (Autor:in) / Loosbergh, M.E. (Autor:in)
MATERIALS PERFORMANCE ; 48 ; 28-32
01.01.2009
5 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
620.11
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case History: Fluoropolymer Lining for a Chlorine Scrubber
British Library Online Contents | 2009
|Long Term Performance of an Asphalt Lined Upper Reservoir, Seneca Pumped Storage Project
British Library Conference Proceedings | 1997
|Case History of a Lined Wastewater Treatment Lagoon Failure
British Library Conference Proceedings | 1996
|Case History of Six 25-Year-Old PVC Geomembrane-Lined Ponds
British Library Conference Proceedings | 2017
|