Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Monotonic and Reverse-Cyclic Loading of Lag Screw Connections for Log Shear Wall Construction
Monotonic and Reverse-Cyclic Loading of Lag Screw Connections for Log Shear Wall Construction
Monotonic and Reverse-Cyclic Loading of Lag Screw Connections for Log Shear Wall Construction
Graham, D.A. (Autor:in) / Carradine, D.M. (Autor:in) / Bender, D.A. (Autor:in) / Dolan, J.D. (Autor:in)
JOURNAL OF MATERIALS IN CIVIL ENGINEERING ; 22 ; 88-95
01.01.2010
8 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
620.11
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Monotonic and Reverse-Cyclic Loading of Lag Screw Connections for Log Shear Wall Construction
Online Contents | 2010
|Gusset plate connections under monotonic and cyclic loading
British Library Online Contents | 2005
|Gusset plate connections under monotonic and cyclic loading
Online Contents | 2005
|