Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
Kim, J.-L. (Autor:in) / Ellis, R.D. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 136 ; 160-169
01.01.2010
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2008
|