Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fast-Tracked Bridge Design: A sophisticated, iterative analytical approach to re-evaluating the bridge superstructure has put this project on the path to completion
Fast-Tracked Bridge Design: A sophisticated, iterative analytical approach to re-evaluating the bridge superstructure has put this project on the path to completion
Fast-Tracked Bridge Design: A sophisticated, iterative analytical approach to re-evaluating the bridge superstructure has put this project on the path to completion
Singh, P.R. (Autor:in) / Schueller, M. (Autor:in)
MODERN STEEL CONSTRUCTION ; 50 ; 38-42
01.01.2010
5 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
693.71
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Superstructure of a Prefabricated Tracked Bridge
NTIS | 1978
|TIBKAT | 2006
|Sophisticated bridge construction
British Library Online Contents | 2010
|