Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
Ali, M. M. (Autor:in) / Elazouni, A. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 27 ; 839-856
01.01.2009
18 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Finance-based CPM-LOB scheduling of projects with repetitive non-serial activities
Online Contents | 2009
|Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
Online Contents | 2011
|Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
British Library Online Contents | 2011
|Float analysis of non-serial repetitive activities
Online Contents | 2003
|Float analysis of non-serial repetitive activities
British Library Online Contents | 2003
|