Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Penetration, cutter wear and rate of advance for TBM operations in hard rock
Penetration, cutter wear and rate of advance for TBM operations in hard rock
Penetration, cutter wear and rate of advance for TBM operations in hard rock
Schneider, E. (Autor:in) / Spiegl, M. (Autor:in) / Turtscher, M. (Autor:in) / Leitner, W. (Autor:in)
TUNNEL -GUTERSLOH- ; 43-52
01.01.2010
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cutter wear mechanisms in hard rock tunnel boring
Wiley | 2018
|Advance rate simulation for hard rock TBMs
Online Contents | 2014
|Advance rate simulation for hard rock TBMs
Springer Verlag | 2014
|TBM penetration rate with rock mass properties in hard rock
British Library Conference Proceedings | 2001
|