Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Ammar, M.A. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 137 ; 65-71
01.01.2011
7 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Online Contents | 2011
|British Library Online Contents | 2002
|Discounted-Cash-flow-Verfahren und Kapitalmarktspekulation
British Library Online Contents | 2004
|