Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Schematic cost estimating model for super tall buildings using a high-rise premium ratio
Schematic cost estimating model for super tall buildings using a high-rise premium ratio
Schematic cost estimating model for super tall buildings using a high-rise premium ratio
Lee, J.-S. (Autor:in) / Lee, H.-S. (Autor:in) / Park, M.-S. (Autor:in)
CANADIAN JOURNAL OF CIVIL ENGINEERING ; 38 ; 530-545
01.01.2011
16 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Evacuation time in tall high-rise buildings
IEEE | 2015
|Selection of Premium Free Structural Systems for Tall Buildings
British Library Conference Proceedings | 1993
|A new modelling technique using a subsystem for structural schematic design of tall buildings
Online Contents | 2004
|Estimating Fundamental Frequencies of Tall Buildings
Online Contents | 2007
|