Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Net Asset Value-Based Concession Duration Model for BOT Contracts
Net Asset Value-Based Concession Duration Model for BOT Contracts
Net Asset Value-Based Concession Duration Model for BOT Contracts
Wu, M. (Autor:in) / Chau, K.W. (Autor:in) / Shen, Q. (Autor:in) / Shen, L.Y. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 138 ; 304-308
01.01.2012
5 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Net Asset Value-Based Concession Duration Model for BOT Contracts
Online Contents | 2012
|Concession contracts for power generation
Emerald Group Publishing | 1994
|Social Welfare–Based Concession Model for Build/Operate/Transfer Contracts
Online Contents | 2015
|The Complexities of Concession Contracts in Brazil
British Library Conference Proceedings | 1997
|