Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
Anastasopoulos, P.C. (Autor:in) / Labi, S. (Autor:in) / Bhargava, A. (Autor:in) / Mannering, F.L. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 138 ; 390-398
01.01.2012
9 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
Online Contents | 2012
|Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment
Online Contents | 2010
|