Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimizing linear project scheduling with multi-skilled crews
Optimizing linear project scheduling with multi-skilled crews
Optimizing linear project scheduling with multi-skilled crews
Liu, S. S. (Autor:in) / Wang, C. J. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 24 ; 16-23
01.01.2012
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimizing linear project scheduling with multi-skilled crews
Elsevier | 2011
|Optimizing linear project scheduling with multi-skilled crews
Online Contents | 2012
|