Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Daily Work Reports-Based Production Rate Estimation for Highway Projects
Daily Work Reports-Based Production Rate Estimation for Highway Projects
Daily Work Reports-Based Production Rate Estimation for Highway Projects
Woldesenbet, A. (Autor:in) / Jeong, H.S. (Autor:in) / Oberlender, G.D. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 138 ; 481-490
01.01.2012
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Daily Work Reports-Based Production Rate Estimation for Highway Projects
Online Contents | 2012
|Optimizing Work Zones for Two-Lane Highway Maintenance Projects
Online Contents | 2002
|