Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment
Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment
Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment
Chan, A. P. (Autor:in) / Yi, W. (Autor:in) / Wong, D. P. (Autor:in) / Yam, M. C. (Autor:in) / Chan, D. W. (Autor:in)
BUILDING AND ENVIRONMENT ; 58 ; 163-171
01.01.2012
9 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimizing work-rest schedule for construction rebar workers in hot and humid environment
British Library Online Contents | 2013
|Optimizing work–rest schedule for construction rebar workers in hot and humid environment
Online Contents | 2013
|