Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Monumental Challenge: In late September and early October 2011, members of Wiss, Janney, Elstner Associates' Difficult Access Team conducted a postearthquake assessment of the Washington Monument, dangling from ropes as the world watched. Civil Engineering presents the story of this assessment
Monumental Challenge: In late September and early October 2011, members of Wiss, Janney, Elstner Associates' Difficult Access Team conducted a postearthquake assessment of the Washington Monument, dangling from ropes as the world watched. Civil Engineering presents the story of this assessment
Monumental Challenge: In late September and early October 2011, members of Wiss, Janney, Elstner Associates' Difficult Access Team conducted a postearthquake assessment of the Washington Monument, dangling from ropes as the world watched. Civil Engineering presents the story of this assessment
Lemieux, D.J. (Autor:in) / Paret, T.F. (Autor:in)
CIVIL ENGINEERING -NEW YORK THEN RESTON- ; 82 ; 50-67
01.01.2012
18 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Online Contents | 2004
|Machine Vision-Enhanced Postearthquake Inspection
British Library Online Contents | 2013
|Machine Vision-Enhanced Postearthquake Inspection
ASCE | 2013
|