Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
Ghoddousi, P. (Autor:in) / Eshtehardian, E. (Autor:in) / Jooybanpour, S. (Autor:in) / Javanmardi, A. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 30 ; 216-227
01.01.2013
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
British Library Online Contents | 2010
|Optimization of Resource-Constrained Project Using Genetic Algorithm
Springer Verlag | 2024
|