Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Impact of Crew Scheduling on Project Performance
Impact of Crew Scheduling on Project Performance
Impact of Crew Scheduling on Project Performance
Hanna, A.S. (Autor:in) / Shapira, A. (Autor:in) / El Asmar, M. (Autor:in) / Taylor, C.S. (Autor:in)
01.01.2013
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.1771
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Impact of Crew Scheduling on Project Performance
ASCE | 2011
|Methodology for Crew-Job Allocation Optimization in Project and Workface Scheduling
British Library Conference Proceedings | 2015
|Crew operation scheduling based on simulated evolution technique
Tema Archiv | 1998
|Optimized crew selection for scheduling of repetitive projects
Emerald Group Publishing | 2020
|