Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 139 ; 161-173
01.01.2013
13 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
British Library Online Contents | 2011
|Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
Online Contents | 2011
|Multiobjective Fuzzy Linear Programming Under Uncertain Resource Parameters
HENRY – Bundesanstalt für Wasserbau (BAW) | 2012
|