Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lagged Surface Collapse Mechanism of Shield Construction in Sandy Pebble Stratum
Lagged Surface Collapse Mechanism of Shield Construction in Sandy Pebble Stratum
Lagged Surface Collapse Mechanism of Shield Construction in Sandy Pebble Stratum
Yongxue, B. (Autor:in) / Taiyue, Q. (Autor:in) / Zhanrui, W. (Autor:in)
TUMU JIANZHU YU HUANJING GONGCHENG ; 35 ; 12-19
01.01.2013
8 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
624.05
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
British Library Conference Proceedings | 2013
|Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
Trans Tech Publications | 2013
|Shield Treatment Technology for Large-Size Pebble Stratum
Springer Verlag | 2021
|Europäisches Patentamt | 2015
|Pebble stratum waterproof curtain construction method
Europäisches Patentamt | 2021
|