Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Effects of the application of activity calendars on the distribution of project duration in PERT networks
Hajdu, M. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 35 ; 397-404
01.01.2013
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Sensitivity analysis in PERT networks: Does activity duration distribution matter?
British Library Online Contents | 2016
|Sensitivity analysis in PERT networks: Does activity duration distribution matter?
British Library Online Contents | 2016
|M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics
Online Contents | 2017
|