Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost-Effective Passage Design for High-Head Hydro Facilities: A new fish passage design developed specifically for high-head hydroelectric plants uses controlled decompression to minimize fish injury during passage. This design is also less expensive than the traditional downstream passage alternatives
Cost-Effective Passage Design for High-Head Hydro Facilities: A new fish passage design developed specifically for high-head hydroelectric plants uses controlled decompression to minimize fish injury during passage. This design is also less expensive than the traditional downstream passage alternatives
Cost-Effective Passage Design for High-Head Hydro Facilities: A new fish passage design developed specifically for high-head hydroelectric plants uses controlled decompression to minimize fish injury during passage. This design is also less expensive than the traditional downstream passage alternatives
Greif, R. (Autor:in) / Steimle, K. (Autor:in) / Brown, R. (Autor:in) / Gessler, D. (Autor:in)
HYDRO REVIEW ; 32 ; 18-33
01.01.2013
16 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cost-Effective Passage Design for High-Head Hydro Facilities
Online Contents | 2013
|Control of fish passage through high-head hydroprojects
Springer Verlag | 2011
|Control of fish passage through high-head hydroprojects
Online Contents | 2011
|Fish Passage/Protection Costs At Hydroelectric Projects
British Library Conference Proceedings | 1993
|