Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel
Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel
Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel
Lin, C. g. (Autor:in) / Zhang, Z. m. (Autor:in) / Wu, S. m. (Autor:in) / Yu, F. (Autor:in)
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY ; 38 ; 306-325
01.01.2013
20 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Key construction technology of Hangzhou Qiantang River 4th Bridge Project of China
British Library Conference Proceedings | 2007
|Monitoring of Large Section Tunnel Crossing Qiantang River during Operation Period
Trans Tech Publications | 2012
|Construction Techniques of the Fourth Qiantang River Main Bridge
British Library Conference Proceedings | 2007
|