Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FIRST LONG-TERM DEPLOYMENT OF ARGO FLOAT IN BALTIC SEA
FIRST LONG-TERM DEPLOYMENT OF ARGO FLOAT IN BALTIC SEA
FIRST LONG-TERM DEPLOYMENT OF ARGO FLOAT IN BALTIC SEA
Purokoski, T. (Autor:in) / Aro, E. (Autor:in) / Nummelin, A. (Autor:in)
SEA TECHNOLOGY ; 54 ; 41-44
01.01.2013
4 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Several Important Issues in Salinity Quality Control of Argo Float
Online Contents | 2010
|Levantine Intermediate and Levantine Deep Water Formation: An Argo Float Study from 2001 to 2017
DOAJ | 2019
|DOAJ | 2019
|FLOAT, FLOAT ASSEMBLY, FLOAT ADAPTER AND INTERFACE, AND FLOAT VIBRATION APPARATUS, AND METHODS
Europäisches Patentamt | 2018
|FLOAT, FLOAT ASSEMBLY, FLOAT ADAPTER AND INTERFACE, AND FLOAT VIBRATION APPARATUS, AND METHODS
Europäisches Patentamt | 2021
|