Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improved Baseline Method to Calculate Lost Construction Productivity
Improved Baseline Method to Calculate Lost Construction Productivity
Improved Baseline Method to Calculate Lost Construction Productivity
Zhao, T. (Autor:in) / Dungan, J.M. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 140 ; 06013006
01.01.2014
6013006 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Improved Baseline Method to Calculate Lost Construction Productivity
Online Contents | 2014
|Improved Baseline Productivity Analysis Technique
Online Contents | 2010
|Improved Baseline Productivity Analysis Technique
British Library Online Contents | 2010
|Construction Baseline Productivity: Theory and Practice
British Library Online Contents | 1999
|