Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium)
Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium)
Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium)
Nuttens, T. (Autor:in) / Stal, C. (Autor:in) / De Backer, H. (Autor:in) / Schotte, K. (Autor:in) / Van Bogaert, P. (Autor:in) / De Wulf, A. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 43 ; 1-9
01.01.2014
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Laser Scanning for Precise Ovalization Measurements: Standard Deviations and Smoothing Levels
Online Contents | 2016
|Laser Scanning for Precise Ovalization Measurements: Standard Deviations and Smoothing Levels
Online Contents | 2016
|A Curvature-ovalization Measurement Apparatus for Circular Tubes Under Cyclic Bending
British Library Online Contents | 1998
|Model of High Speed Railway Wheel Ovalization
British Library Conference Proceedings | 2009
|