Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Schematic study on temperature control and crack prevention during spillway tunnel concreting period
MATERIALS AND STRUCTURES ; 48 ; 3517-3525
01.01.2015
9 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Online Contents | 2014
|Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Springer Verlag | 2014
|Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Online Contents | 2015
|Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Online Contents | 2014
|Concreting steep spillway chute
Engineering Index Backfile | 1967