Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Ghasri, M. (Autor:in) / Maghrebi, M. (Autor:in) / Rashidi, T. H. (Autor:in) / Waller, S. T. (Autor:in)
AUTOMATION IN CONSTRUCTION ; 71 ; 283-293
01.01.2016
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Online Contents | 2016
|Concrete pouring equipment for construction site building construction
Europäisches Patentamt | 2022
|Concrete pouring device for building construction site
Europäisches Patentamt | 2024
|Construction site concrete pouring monitoring system and method
Europäisches Patentamt | 2024
|Concrete pouring and transporting equipment for construction site
Europäisches Patentamt | 2023
|