Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lessons Learned from Construction of Shanghai Metro Stations: Importance of Quick Excavation, Prompt Propping, Timely Casting, and Segmented Construction
Lessons Learned from Construction of Shanghai Metro Stations: Importance of Quick Excavation, Prompt Propping, Timely Casting, and Segmented Construction
Lessons Learned from Construction of Shanghai Metro Stations: Importance of Quick Excavation, Prompt Propping, Timely Casting, and Segmented Construction
Tan, Yong (Autor:in) / Wei, Bin (Autor:in) / Zhou, Xin (Autor:in) / Diao, Yanping (Autor:in)
Journal of performance of constructed facilities ; 29 ; 04014096-04014096
01.01.2015
1 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.10287
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design and Construction of Excavation for Shanghai Metro
British Library Conference Proceedings | 1998
|Design and construction of a deep excavation in soft soils adjacent to the Shanghai Metro tunnels
British Library Online Contents | 2003
|Design and construction of a deep excavation in soft soils adjacent to the Shanghai Metro tunnels
Online Contents | 2003
|