Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waiting Period for Closure Pours in Bridge Widening or Staged Construction
Waiting Period for Closure Pours in Bridge Widening or Staged Construction
Waiting Period for Closure Pours in Bridge Widening or Staged Construction
Chai, Y. H. (Autor:in) / Hung, H. J. (Autor:in)
Journal of bridge engineering ; 21 ; 04016006-04016006
01.01.2016
1 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624/.2/05
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Waiting Period for Closure Pours in Bridge Widening or Staged Construction
Online Contents | 2016
|Field Evaluation of Staged Concrete Bridge Deck Pours Adjacent to Live Traffic
British Library Online Contents | 2019
|Fiber-Reinforced Concrete in Closure Pours over Piers
Online Contents | 2017
|