Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multi-Timescale Joint Optimal Dispatch Model Considering Environmental Flow Requirements for a Dewatered River Channel: Case Study of Jinping Cascade Hydropower Stations
Multi-Timescale Joint Optimal Dispatch Model Considering Environmental Flow Requirements for a Dewatered River Channel: Case Study of Jinping Cascade Hydropower Stations
Multi-Timescale Joint Optimal Dispatch Model Considering Environmental Flow Requirements for a Dewatered River Channel: Case Study of Jinping Cascade Hydropower Stations
Guo, Xin-yu (Autor:in) / Ma, Chao (Autor:in) / Tang, Zhi-bo (Autor:in)
Journal of water resources planning and management ; 144 ; 05018014-05018014
01.01.2018
1 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2010
|Regional tectonic stability at the Jinping hydropower station
British Library Conference Proceedings | 1994
|Optimal short-term operation of a cascade of hydropower stations
British Library Conference Proceedings | 1996
|