Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A simulation-based method for effective workface planning of industrial construction projects
A simulation-based method for effective workface planning of industrial construction projects
A simulation-based method for effective workface planning of industrial construction projects
Hu, Di (Autor:in) / Mohamed, Yasser (Autor:in) / Taghaddos, Hosein (Autor:in) / Hermann, Ulrich (Rick) (Autor:in)
Construction management and economics ; 36 ; 328-347
01.01.2018
20 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A simulation-based method for effective workface planning of industrial construction projects
Taylor & Francis Verlag | 2018
|Resource budget for workface planning in industrial-construction
Emerald Group Publishing | 2019
|Adaptation of WorkFace Planning for construction contexts
British Library Online Contents | 2013
|Adaptation of WorkFace Planning for construction contexts
Online Contents | 2013
|Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning
Online Contents | 2016
|