Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel rockburst criterion based on the TBM tunnel construction of the Neelum–Jhelum (NJ) hydroelectric project in Pakistan
Novel rockburst criterion based on the TBM tunnel construction of the Neelum–Jhelum (NJ) hydroelectric project in Pakistan
Novel rockburst criterion based on the TBM tunnel construction of the Neelum–Jhelum (NJ) hydroelectric project in Pakistan
Ma, C.S. (Autor:in) / Chen, W.Z. (Autor:in) / Tan, X.J. (Autor:in) / Tian, H.M. (Autor:in) / Yang, J.P. (Autor:in) / Yu, J.X. (Autor:in)
Tunnelling and underground space technology ; 81 ; 391-402
01.01.2018
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Neelum-Jhelum Hydroelectric Project: Design and Construction Challenges of Underground Works
British Library Conference Proceedings | 2019
|Bridge over the Jhelum River, Pakistan
Online Contents | 1997
|