Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
Chen, Chen (Autor:in) / Tran Huy, Duc (Autor:in) / Tiong, Lee Kong (Autor:in) / Chen, I-Ming (Autor:in) / Cai, Yiyu (Autor:in)
Automation in construction ; 98 ; 310-321
01.01.2019
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
629.8
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimal Layout of Prefabricated Vertical Drains
ASCE | 2014
|Optimal Layout of Prefabricated Vertical Drains
Online Contents | 2015
|