Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Addressing Project Challenges and Integrating Construction Method Flexibility for the Rand Park Stormwater Diversion Tunnel, Keokuk, Iowa
Addressing Project Challenges and Integrating Construction Method Flexibility for the Rand Park Stormwater Diversion Tunnel, Keokuk, Iowa
Addressing Project Challenges and Integrating Construction Method Flexibility for the Rand Park Stormwater Diversion Tunnel, Keokuk, Iowa
Khwaja, Mahmood (Autor:in) / Sanders, Gregory (Autor:in) / Schultz, Michael S. (Autor:in) / Odrowski, Michael (Autor:in) / Bousselot, Mark (Autor:in) / Schechinger, David R. (Autor:in) / Boggs, Daniel (Autor:in)
2020
Aufsatz (Konferenz)
Englisch
BKL:
56.22
Unterirdisches Bauen, Tunnelbau
British Library Conference Proceedings | 2019
|Construction of the Albany Park Stormwater Diversion Tunnel
TIBKAT | 2020
|The water wheels at Keokuk, Iowa
Engineering Index Backfile | 1912