Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MBTA Beverly Drawbridge: Fabrication Details and Installation Procedures for Rapid Installation
MBTA Beverly Drawbridge: Fabrication Details and Installation Procedures for Rapid Installation
MBTA Beverly Drawbridge: Fabrication Details and Installation Procedures for Rapid Installation
Bendall, S. (Autor:in) / Williams, J. (Autor:in)
AREMA Annual Conference ; 2020 ; Online
2020
Aufsatz (Konferenz)
Englisch
TIBKAT | 1987
|The fabrication of heavy curved drawbridge girders
Engineering Index Backfile | 1908